News Archive:

Fiberglass Supports Terrestrial Radio Equipment

Aug 8, 2022

Located in the Dutch Caribbean, a broadcast transmission facility based on the island of Bonaire recently installed a …

Case Study: Fiberglass Buildings for EMC Testing

May 28, 2019

Strongwell designed, fabricated and erected two 62′ wide x 69′ long x 24′ high buildings for Compaq Computer …

Case Study: DURASHIELD® Building For Testing of Electronic Calibration Equipment

Feb 13, 2019

Strongwell designed and fabricated an all-fiberglass test building for the John Fluke Manufacturing Company of Everett, Washington, a …

Case Study: Computer Testing Facility Constructed of DURASHIELD® Foam Core Panels & EXTREN®

Feb 13, 2019

Designed to meet RFI/EMI codes (eliminates electromagnetic interference) for testing computer equipment, a 33′ wide x 66′ long …

Case Study: Composites Help Steer Towards Wireless Roads Ahead

Feb 12, 2019

In the second annual Composites and Advanced Materials Expo, this application was awarded with the prestigious ACE Award …

Case Study: FRP The ‘Clear’ Choice for Platforms Used in Testing of Radar Equipment

Dec 5, 2018

A pair of platforms constructed using Strongwell’s FRP products is being used by the U.S. Army to help …