News Archive:

Case Study: Pultruded Rods and Nuts Support HVAC Ductwork in Aquatic Environments

Jun 26, 2020

Year-round indoor waterparks continue to push the envelope for innovative design to entertain guests and meet needs. The …

Case Study: Corrosion Management Implemented on Industrial Rooftop Structure

Jun 26, 2020

A chiller support frame with an adjoining platform was recently designed and installed for a premiere manufacturer of …

Case Study: Baffle and Diffuser Walls Aid in Aeration

Jun 26, 2020

A water district system in California underwent a refurbishment process at its wastewater treatment facility to better serve …

Case Study: Pultruded Fiberglass Baffles the Splash

Jun 26, 2020

As the hospitality industry continues to grow, so does the aquatic waterparks sector, due to the demand of …

Durability Study: Decades Later: Still Better than New Steel

Mar 27, 2020

In 1979, over 10,000 square feet of DURAGRIDĀ® I-4000 1″ (formerly DURADEKĀ®) pultruded grating was installed in lieu of …

Durability Study: Cordova Park Observation Tower is Still a Winner After 20 Years

Nov 27, 2019

Rated as the #1 thing to do in Otley, IA, by a major travel website, the 123-foot …

Case Study: Molded Grating Supports New Downtown Flushing Development

Nov 27, 2019

In many applications, molded grating is specified as a chemical resistant flooring choice for industrial applications including (but …

Case Study: Pultruded Handrail Complements Aquatic Park

Nov 27, 2019

Originally built in 1965, the Chatfield Municipal Pool is adjacently located to the Chatfield High School in Minnesota. …

Case Study: Library Greets Patrons with Pultruded Handrail

Jun 24, 2019

A public library in New Jersey recently needed to replace handrail on its main entrance ramp which was …

Durability Study: Will Your 30 Year Old Grating Still Perform?

Jun 21, 2019

The Westfall Company recently acquired a sample of T-Bar grating from a water reclamation facility which has been …