News Archive:

Case Study: Fiberglass Cover Puts a Lid on Air Pollution Problem at Oil Refinery

Nov 28, 2018

A 38′-4″ long x 27′-8″ wide x 5′ high rectangular all-fiberglass cover was designed, fabricated and installed by Strongwell …

Case Study: Operating Aisle Platforms for Saudi Petrochemical Project

Nov 22, 2018

This 10′ x 250′ section of fiberglass operating aisle platform was fabricated and preassembled by Strongwell utilizing EXTREN® …

Case Study: Fiberglass/Graphite Coalescent Grid Increases Refined Oil Production

Nov 13, 2018

Electrostatic dehydrators (used to separate water and salt from oil in the field and in oil refineries) typically …