News Archive:

Case Study: Wet-Dry Lift Station Access Ladders

Jun 30, 2021

The processing of blackwater and greywater discharges are reliant on key infrastructure instruments within any municipality. To address …

Case Study: All’s Well Ends Well

Oct 22, 2020

Wastewater collection and treatment is an essential function of all communities. In processing wastewater, the force of gravity …

Case Study: SAFPLATE® Goes Right to the Top

Feb 14, 2019

Customizing pultruded plate to resemble ceramic tiles permits cellular shields to attractively blend into existing architecture. Strongwell has …

Case Study: DURASHIELD® Building For Testing of Electronic Calibration Equipment

Feb 13, 2019

Strongwell designed and fabricated an all-fiberglass test building for the John Fluke Manufacturing Company of Everett, Washington, a …

Case Study: Fiberglass Grating and Handrail Take the Shock Out of Electricity

Jan 23, 2019

140,000 amps of DC electricity flow through transformers that power the aluminum manufacturing process at Intalco Aluminum in …

Case Study: Fiberglass Grating Stays Ship Shape Longer

Jan 23, 2019

“No Le Hace” is a 74′ power boat built by Delta Marine, Seattle, Washington. She has made over …

Case Study: Fiberglass Floating Docks Save High Maintenance Costs

Jan 23, 2019

Seepage from Snohomish County, Washington landfill mounds is held in containment pits where it is treated with bacteria …