Case Study: Future Maintenance Problems Eliminated with Fiberglass Structures
The Pump station in Des Moines, Iowa was built to handle excess sanitary and storm sewer loads. When …
The Pump station in Des Moines, Iowa was built to handle excess sanitary and storm sewer loads. When …
The Toledo Edison Bayshore power plant in Toledo, Ohio, chose all-fiberglass materials when it needed to replace and enlarge its intake …
Designed to meet RFI/EMI codes (eliminates electromagnetic interference) for testing computer equipment, a 33′ wide x 66′ long …
The Quesnel River Pulp Plant in Quesnel, British Columbia, was under an odor control mandate from the Canadian …
The production of the chemical phosgene used in the manufacture of polycarbonate must be carefully monitored and controlled, …
The Trinity River Authority (TRA) needed to cover up a big problem. The utility group needed to place …
Over sixteen years ago EXTREN® fiberglass structural shapes, DURASHIELD® building panels and FIBREBOLT® fiberglass studs and nuts were installed …
A 37′ tall, all-fiberglass spire installed atop the 55-story NationsBank building is the golden high point on the …