News Archive:

Case Study: Cold is no Problem for DURASHIELD® Building on Alaskan North Slope

Feb 13, 2019

Long known for its excellent corrosion resistance and high strength, DURASHIELD® is also proving itself in the harsh …

Case Study: DURASHIELD® Building For Testing of Electronic Calibration Equipment

Feb 13, 2019

Strongwell designed and fabricated an all-fiberglass test building for the John Fluke Manufacturing Company of Everett, Washington, a …

Case Study: Intake Screen Enclosure Defies Mist and Humidity

Feb 13, 2019

The Toledo Edison Bayshore power plant in Toledo, Ohio, chose all-fiberglass materials when it needed to replace and enlarge its intake …

Case Study: Computer Testing Facility Constructed of DURASHIELD® Foam Core Panels & EXTREN®

Feb 13, 2019

Designed to meet RFI/EMI codes (eliminates electromagnetic interference) for testing computer equipment, a 33′ wide x 66′ long …

Case Study: Composite Wall Support System Creates Thermal Break Advantages

Dec 28, 2018

From highs in the summer pushing 90° F to winter lows in the range of -40° F, the …

Case Study: FRP Arctic Towers Project Wins Top Construction Award

Dec 28, 2018

Strongwell’s Fiber Reinforced Polymer (FRP) products were recently used by Wade Perrow Construction, LLC (WPC) for a Seal …

Case Study: Endangered Atlantic Salmon Protected by FRP

Dec 27, 2018

The United States Fish and Wildlife Service has established the Craig Brook National Fish Hatchery in East Orland, …

Case Study: Fiberglass Cooler/Freezer Door Jamb Insulates and Saves Energy

Nov 13, 2018

An efficient walk-in cooler/freezer requires a specially constructed door assembly to provide a tight seal without freezing up. …