News Archive:

Case Study: Fiberglass Catwalk Lightens The Load for Airplane Hanger

Jan 22, 2019

Platforms made of DURAGRID® I-7000 grating are part of the new FedEX 747 hanger at the Anchorage Airport, …

Case Study: DURATREAD™ Offers Fast Track Solution for Rail Operators

Jan 22, 2019

Located in Baltimore, Maryland, the eighth busiest rail station in the United States needed a quick, drop-in solution …

Case Study: FRP Inserted into Award Winning Art Deco Museum Entrance

Jan 22, 2019

In 2011, the Virginia Museum of Fine Arts in Richmond, Virginia needed to install a low-maintenance, non-conductive walking …

Case Study: FRP Withstands Corrosive Environment

Jan 22, 2019

In 2009, the city of Phoenix needed to install a walking surface at a lift station that houses …

Case Study: Molded Grating Adds Aesthetic Touch to Train Station

Jan 21, 2019

In July of 2007, the Metrolink commuter train service in California opened a new station in Buena Park, …

Case Study: DURATREAD™ Saves National Park Time, Money in Stair Renovation

Jan 21, 2019

Strongwell’s DURATREAD™ stair tread covers were vital to the renovation of a flight of stairs at Kentucky’s Mammoth …

Case Study: FRP Debuts in First Composites Arch Bridge System Overseas

Jan 15, 2019

According to the Federal Highway Administration (FHWA), as of December 2013, there are over 29,000 structurally deficient and …

Case Study: COMPOSOLITE® A Strong Choice for Wastewater Applications

Jan 15, 2019

A group of tertiary treatment plants with open reclaimed water contact basins in Southern California needed a solution …

Case Study: Easy Access with Fabricated Covers

Jan 15, 2019

The Mulberry wastewater treatment plant, located in Fort Collins, Colorado, installed FRP covers. The treatment plant required a removable …

Case Study: Containment Success at Bergen Park in Denver

Jan 15, 2019

Chalk another one up for the time-saving COMPOSOLITE® Secondary Containment System! This type of containment is essential for …