News Archive:

Case Study: Cold is no Problem for DURASHIELD® Building on Alaskan North Slope

Feb 13, 2019

Long known for its excellent corrosion resistance and high strength, DURASHIELD® is also proving itself in the harsh …

Case Study: DURASHIELD® Building For Testing of Electronic Calibration Equipment

Feb 13, 2019

Strongwell designed and fabricated an all-fiberglass test building for the John Fluke Manufacturing Company of Everett, Washington, a …

Case Study: Future Maintenance Problems Eliminated with Fiberglass Structures

Feb 13, 2019

The Pump station in Des Moines, Iowa was built to handle excess sanitary and storm sewer loads. When …

Case Study: Intake Screen Enclosure Defies Mist and Humidity

Feb 13, 2019

The Toledo Edison Bayshore power plant in Toledo, Ohio, chose all-fiberglass materials when it needed to replace and enlarge its intake …

Case Study: Computer Testing Facility Constructed of DURASHIELD® Foam Core Panels & EXTREN®

Feb 13, 2019

Designed to meet RFI/EMI codes (eliminates electromagnetic interference) for testing computer equipment, a 33′ wide x 66′ long …

Case Study: DURASHIELD®/EXTREN® Cover Corrosion Problems at Pulp and Paper Plant

Feb 13, 2019

The Quesnel River Pulp Plant in Quesnel, British Columbia, was under an odor control mandate from the Canadian …

Case Study: Foam Core Structure Isolates Toxic Chemical For Worker Safety

Feb 12, 2019

The production of the chemical phosgene used in the manufacture of polycarbonate must be carefully monitored and controlled, …

Case Study: FRP Debuts in First Composites Arch Bridge System Overseas

Jan 15, 2019

According to the Federal Highway Administration (FHWA), as of December 2013, there are over 29,000 structurally deficient and …

Case Study: COMPOSOLITE® A Strong Choice for Wastewater Applications

Jan 15, 2019

A group of tertiary treatment plants with open reclaimed water contact basins in Southern California needed a solution …

Case Study: Easy Access with Fabricated Covers

Jan 15, 2019

The Mulberry wastewater treatment plant, located in Fort Collins, Colorado, installed FRP covers. The treatment plant required a removable …